Log and resolve site issues
Capture construction issues, safety concerns, snags and change requests from site, assign owners and track them through to resolution.
A site issue is any construction problem that needs tracking — a dimensional defect, a safety hazard, a vendor dispute, a snag identified at hand-over. Site Supervisors log them from the field; Site Engineers and Senior Site Managers resolve them.
Statuses
| Status | Meaning |
|---|---|
OPEN |
Logged, not yet triaged. |
IN_PROGRESS |
Owner is actively resolving. |
BLOCKED |
Needs an external input (vendor, approval). |
RESOLVED |
Fixed in the field. |
VERIFIED |
Fix has been inspected and signed off. |
Log an issue
Step 1: Open Project management → Site issues
Pick the project. Click Log issue.
site-issues-01.png
Step 2: Fill in the issue card
Enter Title, Description, Severity (Low, Medium, High, Critical), Category (Civil, MEP, Finishing, Safety, Material defect) and the Area (which block, floor or unit).
Step 3: Attach photos
Upload field photos. Multiple photos per issue are supported.
Step 4: Assign an owner
Pick the Site Engineer or Senior Site Manager who will drive resolution.
Step 5: Save
The issue is logged in OPEN.
Work the issue
Step 1: Open the issue → Change status
Move to IN_PROGRESS when work starts. Add comments on the activity trail as work progresses.
Step 2: Mark Resolved
When the fix is done, upload a resolution photo and move the status to RESOLVED.
Step 3: Senior Site Manager verifies
The Senior Site Manager (or anyone with higher status) inspects, confirms and moves to VERIFIED. This is the final state.
Reports
- Open issues by project — count of unresolved issues per site.
- Average time-to-resolution — median resolution time by severity.
- Issues by category — civil vs MEP vs safety breakdown.