Log and resolve site issues

Capture construction issues, safety concerns, snags and change requests from site, assign owners and track them through to resolution.

4 min read·Updated 10 Oct 2026·project-managementsite-issues

A site issue is any construction problem that needs tracking — a dimensional defect, a safety hazard, a vendor dispute, a snag identified at hand-over. Site Supervisors log them from the field; Site Engineers and Senior Site Managers resolve them.

Statuses

Status Meaning
OPEN Logged, not yet triaged.
IN_PROGRESS Owner is actively resolving.
BLOCKED Needs an external input (vendor, approval).
RESOLVED Fixed in the field.
VERIFIED Fix has been inspected and signed off.

Log an issue

Step 1: Open Project management → Site issues

Pick the project. Click Log issue.

Screenshot pendingsite-issues-01.png
Site issues list

Step 2: Fill in the issue card

Enter Title, Description, Severity (Low, Medium, High, Critical), Category (Civil, MEP, Finishing, Safety, Material defect) and the Area (which block, floor or unit).

Step 3: Attach photos

Upload field photos. Multiple photos per issue are supported.

Step 4: Assign an owner

Pick the Site Engineer or Senior Site Manager who will drive resolution.

Step 5: Save

The issue is logged in OPEN.

Work the issue

Step 1: Open the issue → Change status

Move to IN_PROGRESS when work starts. Add comments on the activity trail as work progresses.

Step 2: Mark Resolved

When the fix is done, upload a resolution photo and move the status to RESOLVED.

Step 3: Senior Site Manager verifies

The Senior Site Manager (or anyone with higher status) inspects, confirms and moves to VERIFIED. This is the final state.

Reports

  • Open issues by project — count of unresolved issues per site.
  • Average time-to-resolution — median resolution time by severity.
  • Issues by category — civil vs MEP vs safety breakdown.

What's next

  • Progress photos — upload general progress photos not tied to a specific issue.
  • Project milestones — milestones that cannot complete until related issues are verified.